☰ MENU

New Building Project

Building Project Updates: October 6, 2017 Elcho Construction Report.pdf September 2017 Elcho Activity Report.pdf

Important Announcement Regarding Construction

Access and Parking by School's Front Entrance

Owano Street in front of the school will be CLOSED during times of bus drop-off and pick-up.  Cars that are temporarily parked on Owano Street will not be allowed to leave the street when buses are present:
  • CLOSED – Only Bus Traffic Allowed 7:30 a.m. to 7:50 a.m.
  • CLOSED – Only Bus Traffic Allowed 2:45 p.m. to 3:30 p.m.
  • DO NOT attempt to drive up to the main entrance during bus times.  Student drop off during those times will require parents to park in Lot A (see below) and walk their child(ren) to the school or to the crossing guard that will be on the corner of Antigo Street (HWY 45/47) and Owano Street.

Map of Elcho area
PARKING
All parking will need to occur in the town lots east of the post office located between Elcho, Owano, Dorr and Elmo Streets.  (Noted as Lot A and Lot B)

  • No access or parking on the north side of the building – where Elcho Street and Antigo Street meet - due to construction vehicles.  Public Library parking on Owano Street.  (See above for times it is closed.)
  • No parking near the tennis courts on Owano Street.
  • The entire area behind the building will be fenced off for construction purposes.
  • After hours parking could still occur in the limited-term slots on the one-way section of Owano Street.  However, buses for events will still need to travel through that street for drop off and pick up.  Parking should not occur in non-designated areas, regardless of the time of day.

PLAYGROUND
The playground will be CLOSED throughout the construction project.  Please talk to your students/children about the safety concerns related to a construction project and make sure they know that they should never try to go inside of the fenced-off areas to play. 

Please be aware of your surroundings while driving near our school.
Thank you for helping us keep our children safe

REFERENDUM INFORMATION Date of Referendum: November 8th, 2016 Baird Financial Presentation.pdf Preliminary Floor Plans.pdf Springsted Inc. Community Survey Conclusions.pdf Community Task Force Members.pdf Upcoming Informational Meetings.pdf New Building Drawings and Referendum Information.pdf